Xinertai Hydraulic Machinery
Service Hotline:18231838823
Banner
Sliding the door
Sliding the door

Cable-stayed screw hoist|Round cast iron pat gate The operating procedures of the gate hoist of Kangyu Hydraulic Machinery Factory, Xinhe County, Hebei Province, are self-opening and closing, and the duties of relevant personnel will be strictly investigated. 1. The operation of the gate hoist must be dispatched by the person in charge of the unit. Without dispatching without authorization 2. Non-workers of this unit are not allowed to operate hoist and related equipment. 3. Operators must be familiar with the operation, concentrate their thoughts, guard their posts, and strengthen surveillance. During the opening and closing process, the operator should pay attention to safety. 4. Before turning on and off, check the position of the screw rod, whether the motor, gearbox, belt, etc. are abnormal. After confirming that it is normal, power on and turn on and off, and check the dispatcher, operator, the purpose of opening and closing, and equipment. The status and start-up time shall be filled in the "Record of Operation of Gate Hoist". 5. After shutting down and shutting down and completing the opening and closing, the shutdown time, number of switch wires, equipment operation status, etc. should be written off in the "Gate Hoist Operation Record", and the opening and closing time, number of switch wires, dispatcher, and operator , The use of opening and closing, etc. are written off in the "Water and Rain Observation Table". 6. If there is a power outage during the opening and closing process, the reverse switch should be placed in the neutral position and the power should be turned off, and then the belt should be removed to open and close manually. pin. The main products are: 7. To monitor the operating status of the gate hoist, pay attention to the following points: 1. Pay attention to whether the screw of the gate hoist can stop moving in the requested direction, whether the motor and gearbox are running well, the gearbox and the wire Whether the lever wheel can move synchronously. 2. Check whether the motor speed and temperature rise are normal, whether the vibration is too large, and whether the sound is abnormal. If abnormal conditions are found, immediately shut down for inspection to avoid equipment deformation or damage, and report to the dispatcher and the in-charge engineering guide. 3. After shutting down at the end of opening and closing, check again whether the number of gate opening and closing wires is accurate.

Address:Xiwang Development Zone, Jizhou District, Hengshui City, Hebei Province  电话:18231838823  MobilePhone:18231838823  E-mail:1269432504@qq.com

Mobile